Fitting Optradam Plus upper jaw lower jaw

Absolute drying with rubber dam prior to fitting veneer

Extraction 46 with socket preservation

Curettage of alveole and application of EasyGraft

Root pins ER system with composite construction 25 26 8346

Root pins ER-system, adhesion with RelyX, construction with G-aenial

Ceramic conditioning

Preparation of various ceramic material prior to implantation

Wisdom tooth removal 18 48

Anaesthesia, osteotomy, wound closure, draining strips

Clip-temp. inlay 45

Provisional treatment following preparation of small cavities

Building up lower jaw front adhesive

Edge abutments 32-34 with bite raising

Intra-oral anaesthesia techniques

Surface and terminal anaesthesia, nerve blocks to remove the wisdom teeth

Removal of fractured tooth 14

Removal of root residues following tooth fracture

Extraction of destroyed tooth 13

Gentle extraction, bone preservation

Chamfer preparation with guide pin diamonds

Using with chamfer milling tools with guide pin

Gingivectomy with Laser 23, Expasyl

Sulcus management with laser and Expasyl

Drying with DryTips

Keeping the parotid gland dry, retaining the cheek

Prep. rounded drill matrices adjacent tooth

Ceramic inlay, protecting the adjacent tooth

Gingivectomy with electrotome, Expasyl

Electrotome and manual application of Expasyl

Fitting Optragate

Opening and applying an Optragate